
Loading...

Loading...
Quoting, shop drawings, production, delivery, and invoicing run off one record, the approved shop drawing. Precast Edition is live today.


New, and free
Annie is our free assistant. Answer a few questions about one of your workflows and, in about five minutes, she hands back a one-page map of where each step belongs: work for code, work for a connected database and tools, work where AI can help with guardrails, and work that is best left to your people. No sign-up, and you see your map before we ask you for anything.
Free. No sign-up. About five minutes.
Thirty seconds
We build the ERP for fabrication shops. Here is who we are, in half a minute.
The ERP for custom fabrication shops. One approved shop drawing runs quoting, production, delivery, and invoicing.
Watch on YouTubeThe problem, in their words
NIST put a number on it: fabricators lose 1.2% of revenue every year to data re-keyed between systems that don't talk. We ran the numbers.
Sent for approval three weeks ago. Which revision? Who has it? Nobody can say without digging through email.
One person knows how it works. Every quote is a copy of a copy, and one broken formula prices a job wrong.
The only way to know what's cut, cured, assembled, or ready to ship is to go look. The office is always a day behind the shop.
DhyanaERP Editions
Every edition runs on the same proven system: quoting, shop drawing approval, production tracking, delivery, and invoicing off one record. The industry layer on top is built for how your shop actually works.
The shift
Most software just adds another place to type things. A quoting tab here, a scheduling board there, a label app, an invoicing package, and a person in the middle re-keying the same job into all of them. DhyanaERP works the other way around. The approved shop drawing is the record. The production schedule, the QC checklist, the item label, the bill of materials, and the invoice are all views of that one drawing. Nothing gets re-keyed, because there is nothing to re-key. Approve the drawing and the rest already knows.
Approved shop drawing
The primary record
End to end
One job moves through the whole shop without ever leaving the system. Here is the path every order takes.
The product
These screens are from the live Precast Edition. Every edition shares this core.





Why I built this
I came up in the trades. Third generation mason, then years across HVAC, electrical, plumbing, general contracting, estimating, and precast operations as an estimator, designer, and ops manager. When I was running a plant, I spent six months looking for software that could handle precast the way precast actually works.
Everything was either a general ERP with precast bolted on the side, or a stack of spreadsheets held together by one person who could never take a day off. So I taught myself to build, and I built this one inside a working plant, next to the people who would use it. The test I hold every screen to has not changed since: will my dad use it?
Precast was the first shop with this problem I could fix. Metal, millwork, and glass shops run the same loop, from design to approved drawings to fabrication, so the same core is becoming an edition for each of them.
The philosophy
The industry's motto is “move fast and break things.” We do the opposite. DhyanaTech is built on what we call Artificial Mindfulness, an idea rooted in Calm Technology: software should inform without shouting for your attention, surface what matters, and hide what does not. On a shop floor that means big tap targets, almost no typing, and screens a crew can read with gloves on in the sun.
We do not measure success by how long you stay in the app. We measure it by how fast you can get back to the work.
Will my dad use it? If the answer is no, it is not done yet.
The rest of the suite
DhyanaERP is the whole focus here. It is also part of a larger suite we build the same careful way. Two of them come with every Precast Edition plan at no extra charge.
There is also DhyanaCEO, DhyanaPM, DhyanaCFO, and DhyanaHR for the business side. See the full suite
Pricing: Precast Edition
No seat counts, no tiers to decode. Unlimited users at every shop, with DhyanaTakeoff and DhyanaCAD included at no extra charge.
Annual billing takes 10% off, and the advertised price includes sales tax, so what you see is what you pay. Setup is self-serve and free. White-glove onboarding, where we do the setup for you, is a one-time fee of $1,000 per shop. Never required.
Metal, Millwork, and Glass edition pricing will be announced at launch. Talk to us about early access.
Questions shops ask
Book a demo and we will walk your shop through the system on a call. No slides, no pressure, no six-month rollout. If it is not a fit for you, we will say so.
Precast Edition is live and ready to use today.
DhyanaTech is the maker of DhyanaERP, the ERP for fabrication shops, with editions for precast concrete (live today), metal fabrication, millwork, and glass, and a B2B technology company based in Knoxville, Tennessee, designing software solutions guided by Artificial Mindfulness, a design philosophy rooted in Calm Technology that prioritizes user respect over engagement extraction. The DhyanaTech suite includes DhyanaCEO (business planning), DhyanaPM (project management), DhyanaERP (manufacturing operations), DhyanaCFO (financial intelligence), DhyanaHR (people management), DhyanaCAD (design tools), and DhyanaTakeoff (quantity takeoff & estimating).